Site Preparaon Checklist for SRX1600
The checklist in Table 22 on page 32 summarizes the tasks you need to perform when preparing a site
to install the SRX1600 .
Table 22: Site Preparaon Checklist to install the SRX1600
Item or Task Addional Informaon
Environment
Verify that environmental
factors such as temperature
and humidity do not exceed
device tolerance levels.
"Environmental Requirements and Specicaons for SRX1600" on page 35
Power
Measure the distance
between the external power
sources and the device
installaon site.
Locate sites for connecon of
system grounding.
Calculate the power
consumpon and
requirements.
Rack Requirements
Verify that your rack meets
the minimum requirements.
"Rack Requirements for the SRX1600" on page 37
Rack Installaon
32