Table 22: Site Preparaon Checklist to install the SRX1600
(Connued)
Item or Task Addional Informaon
Plan the rack locaon,
including required space
clearances.
Secure the rack to the oor
and building structure.
Cables
• Acquire cables and
connectors.
• Review the maximum
distance allowed for each
cable. Choose the length
of cable based on the
distance between the
hardware components
being connected.
•
Plan the cable roung and
management.
SRX1600 Site Guidelines and Requirements
IN THIS SECTION
General Site Installaon Guidelines | 34
Site Electrical Wiring Guidelines | 34
Environmental Requirements and Specicaons for SRX1600 | 35
Clearance Requirements for Hardware Maintenance of the SRX1600 | 36
33