52
Unite
®
Panel System - Tile Installation
Assembly Instructions
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
72” Panel Frame - Split Tile
Installation (cont.)
3. If beltway-height power is
installed in a 72” panel frame,
install the tile with the left-hand
cut-out to the left side of the frame
and the right-hand cut-out to the
right side (Figure 9).
4. If a 72” split-tile frame is to have
segmented tiles, slat wall tiles, or
if installation is to be tile-to-floor
tile installation, see pages 47
through 48 (Figures 3 & 4,
Details E, F & G).
Figure 9-72 Panel Frame, Beltway-Height Power”
Rare Earth Magnets used with this product. The magnets can
be harmful to pacemaker wearers and others with medical
devices. Pacemaker wearers should stay at least one
foot away from the steel tiles.