11
INFORMATION ABOUT OPTIONAL
COMPONENTS
EN 158
11.8 3rd + 4th PTO (configurations)
F
ig. 11.32
Hydraulic pumps on the 3rd and 4th PTO can be installed at
the same time.
In some configurations, there is also the centering ring
C
on
the 4th PTO.
Important
•
For disassembly or installation, refer to Par. 11.5,
Par. 11.6 and Par. 11.7.
•
Always replace the gasket of the rings B and C and
flanges D and K at each assembly.
•
Lubricate the gear H with oil.
Fig. 11.33
11.9 Balancer device (replacement)
•
Before proceeding with operation, read Par.
3.3.2.