EasyManua.ls Logo

Leviton D4200 - Installation Recommendations; Installation Steps

Leviton D4200
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Guide
Leviton D4200 LCD Ver 2.0 Architectural Lighting Controller Page 2 of 80
Installation Recommendations
For best results using the Dimension 4200 Architectural Lighting
Controller, follow these recommendations:
1: Plan the system before beginning the installation.
2: Terminate the wiring
3: Test the wiring.
Verify wiring for shorts and open circuits.
4: Install all Stations
5: Connect dimmer cabinets.
6: Power up the Stations
7: Program Each Station
Assign unique network ID numbers to stations.
Connect one master station, and then one remote control
station at a time.
Verify that the first D4200 can properly control the dimmers
assigned to it.
Check the proper operation of each station as it is installed
when multiple stations are involved.
If the lighting control fails or becomes sporadic, first
check the wiring or network ID.

Table of Contents

Other manuals for Leviton D4200

Related product manuals