EasyManua.ls Logo

LPKF ProtoMat S63 - Page 74

Default Icon
105 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation ProtoMat S
72 HB V0.9/Mrz-11 © 2011 LPKF AG
6
The drilling spindle rotates and the dust extraction is activated.
5. Click on [Lift head up/down ].
The mill/drill head is lowered according to the milling depth setting.
6. Click [+X], [-X], [+Y] or [-Y] until the final position is reached.
Now the milling track is produced.
7. Click on [Lift up/down head].
The mill/drill head will be lift up.
8. Click on [Motor on/off].
The drilling spindle stops and the dust extraction will be deactivated.
9. For further milling tracks you have to repeat the steps 3 to 8.
Now the milling path is produced.

Table of Contents

Related product manuals