Operation ProtoMat S
72 HB V0.9/Mrz-11 © 2011 LPKF AG
6
➨ The drilling spindle rotates and the dust extraction is activated.
5. Click on [Lift head up/down ].
➨The mill/drill head is lowered according to the milling depth setting.
6. Click [+X], [-X], [+Y] or [-Y] until the final position is reached.
➨ Now the milling track is produced.
7. Click on [Lift up/down head].
➨ The mill/drill head will be lift up.
8. Click on [Motor on/off].
➨ The drilling spindle stops and the dust extraction will be deactivated.
9. For further milling tracks you have to repeat the steps 3 to 8.
♦ Now the milling path is produced.