Manitowoc Published 05-09-17, Control # 011-29 3-77
16000 OPERATOR MANUAL OPERATING CONTROLS AND PROCEDURES
3. Perform the remaining steps only if power supply cord
will be disconnected or electrical system is being
serviced:
a. Turn off external power supply.
b. Unplug power supply cord from crane.
CIRCUIT BREAKERS
See Section 3 in the Service Manual for identification and
location of circuit breakers used to protect crane’s electric
circuits.