Manitowoc Published 05-09-17, Control # 011-29_v2 4-17
16000 OPERATOR MANUAL SET-UP AND INSTALLATION
Handling Crawlers
See Figure 4-11 for the following procedure.
1. Attach hooks from chain sling (7, View A and B) to four
shackles (9) on crawler lifting lugs — two legs with grab
hooks on outboard side.
2. Using grab hooks, shorten both outboard legs eleven
chain links so crawler tips inward when lifted.
3. Position chains between crawler pads (View A).
View A
CRAWLER SHIPPING ARRANGEMENT
View B
CARBODY SHIPPING ARRANGEMENT
View C
CARBODY/CRAWLER WORKING ARRANGEMENT
14a
11
12a 13a
12
11a
13
14
11a
11
12a and 13a
Under Guard
14 12 13
Component Identification
Item Description
11 Hydraulic Hose
11a Coupler
12 Hydraulic Hose
12a Coupler
13 Hydraulic Hose
13a Coupler
14 Grease Hose
14a Coupler
6
P2232e
P2232d
P2232f
FIGURE 4-12