EasyManua.ls Logo

Manitowoc 16000 - Page 188

Manitowoc 16000
230 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reference Only
SET-UP AND INSTALLATION 16000 OPERATOR MANUAL
4-50
Published 05-09-17, Control # 011-29_v2
FIGURE 4-26
7a or 7b
2a
Stored
2a
4
A11543-1
View B
Shipping Position
Collars Toward Inside
of Boom Sections
Legend
Item Description
1Strap
2a Link (Standard)
2b Link (Intermediate Suspension)
3 Pin (shipping)
4 Link (shipping)
5 Pin, with Collar, Retaining Pin, and Cotter Pins
6 Pin, with Collar, Retaining Pin, and Cotter Pins
7a Pendant, 8 ft (2,4 m) Long
7b Pendant, 8 ft, 7 in (2,6 m) Long
8 Adjustable Link
9Pin
10 Link
11 Pin
12 Pendant
13 Pin
14 Link
15a Pin (Standard)
15b Pin, 7-3/4 in (197 mm) Long
4
3
1
1
A11543-2
3
Luffing Jib Straps, Links, and all Hardware Must be
Removed if Luffing Jib is Not Used
2a
View A
Working Position
5
View C
1
1
6
2b
5
8
9
10
11
12
15b
14
13
15a
Stored
NOTE: The intermediate suspension parts are stored
in the boom butt and in the parts box supplied
with the crane.

Table of Contents

Other manuals for Manitowoc 16000

Related product manuals