EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove RT9150E

Manitowoc Grove RT9150E User Manual

Manitowoc Grove RT9150E
328 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #235 background imageLoading...
Page #235 background image
4-1
RT9150E OPERATOR MANUAL SET-UP AND INSTALLATION
4
Grove
Published 2-23-2017, Control # 644-00
SECTION 4
SET-UP AND INSTALLATION
SECTION CONTENTS
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
Accessing the Hoist area. . . . . . . . . . . . . . . . . . . . 4-2
Travel Configuration . . . . . . . . . . . . . . . . . . . . . . . 4-2
Working Configuration . . . . . . . . . . . . . . . . . . . . . 4-2
Hoist Cable (Wire Rope). . . . . . . . . . . . . . . . . . . . . 4-2
Removing the Old Cable. . . . . . . . . . . . . . . . . . . . 4-2
Installing a New Cable . . . . . . . . . . . . . . . . . . . . . 4-3
Cable Reeving. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
Dead-End Rigging/Wedge Sockets. . . . . . . . . . . . 4-5
Installing Wedge and Socket . . . . . . . . . . . . . . . . 4-5
Counterweight Removal and Installation . . . . . . 4-12
Counterweight Stand Installation . . . . . . . . . . . . 4-12
Standard Fabricated Counterweight Installation. 4-12
Standard Fabricated Counterweight Removal . . 4-13
Heavy Fabricated Counterweight Installation . . . 4-14
Heavy Fabricated Counterweight Removal . . . . 4-14
17,690 kg (39,000 lb) Cast Counterweight
Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-15
17,690 kg (39,000 lb) Cast Counterweight
Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-16
Heavy Cast Counterweight Installation. . . . . . . . 4-16
Heavy Cast Counterweight Removal . . . . . . . . . 4-17
Counterweight Stand Removal. . . . . . . . . . . . . . 4-18
Outrigger Removal and Installation . . . . . . . . . . 4-19
Bleed Valve Operation . . . . . . . . . . . . . . . . . . . . 4-19
Outrigger Box Removal. . . . . . . . . . . . . . . . . . . . 4-19
Outrigger Box Installation . . . . . . . . . . . . . . . . . . 4-21
Anti Two Block (A2B) Switch. . . . . . . . . . . . . . . . 4-22
Lock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-22
Unlock. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-22
Before Operation . . . . . . . . . . . . . . . . . . . . . . . . 4-22
Boom Extensions . . . . . . . . . . . . . . . . . . . . . . . . . 4-24
Installing the Folding Boom Extension. . . . . . . . . 4-25
Securing Extension with Tag Line (Rope) . . . . . . 4-26
Relieving the Load on Connecting Lugs . . . . . . . 4-26
Extension Erecting Warnings and Requirements 4-26
Erecting Procedure: 36 ft (11 m) Extension. . . . . 4-26
Erecting Procedure: 59 ft (22 m) Extension. . . . . 4-29
Extension Electrical Connections . . . . . . . . . . . . 4-32
Connecting the Anti-Two Block Switch . . . . . . . . 4-33
Extension Hydraulic Connections (Optional
Hydraulic Extension) . . . . . . . . . . . . . . . . . . . . . . 4-34
Folding Deflection Sheaves. . . . . . . . . . . . . . . . . 4-36
Positioning/Removing the Hoist Cable . . . . . . . . 4-37
Mechanical Luffing Jib (Adjustable Boom
Extension) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-38
Stowing the Folding Boom Extension . . . . . . . . . 4-40
Boom Extension Transport Condition . . . . . . . . . 4-43
Installing and Removing the 26 ft (8 m) and
19 ft (6 m) Extension Inserts . . . . . . . . . . . . . . . . 4-44
Auxiliary Single-sheave Boom Nose . . . . . . . . . . 4-51
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-51
Removal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-51
Working Position . . . . . . . . . . . . . . . . . . . . . . . . . 4-52
Rigging the auxiliary boom nose . . . . . . . . . . . . . 4-52
Transport Position . . . . . . . . . . . . . . . . . . . . . . . . 4-52
Heavy Duty Luffing Boom Extension . . . . . . . . . 4-53
Installation and Removal . . . . . . . . . . . . . . . . . . . 4-53
Heavy Duty Nose Sheave . . . . . . . . . . . . . . . . . . 4-53
Stowed Position. . . . . . . . . . . . . . . . . . . . . . . . . . 4-53
Anemometer/Aircraft warning Light . . . . . . . . . . 4-54
Mounting Anemometer/Aircraft Warning Light. . . 4-54
Removing Anemometer/Aircraft Warning Light . . 4-54
GENERAL
This section provides procedures for installing the hoist
cable (wire rope) on the hoist drum, cable reeving, dead-end
rigging, counterweight removal and installation, outrigger
removal and installation, swingaway boom removal and
installation, and hydraulic boom extension connecting and
disconnecting.
Reference Only

Table of Contents

Other manuals for Manitowoc Grove RT9150E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove RT9150E and is the answer not in the manual?

Manitowoc Grove RT9150E Specifications

General IconGeneral
BrandManitowoc
ModelGrove RT9150E
CategoryConstruction Equipment
LanguageEnglish

Related product manuals