Operating Instructions - CPC6050 13
Modular Pressure Controller
CPC6050
3.2 Turning On
You can conrm that your CPC6050 is operational right now. Apply power to the power connector on the
rear of the instrument with the included power cord, remove any plastic plugs from the rear panel pres-
sure ports, and press the power switch to ON. The system will go through an initialization process, which
takes about 30 seconds, and then a display will appear similar to the screen shown below.
Power Switch
ON/OFF
!
Caution
Earth Ground! Any power adaptors or surge protection devices that negate the
protective earth ground should not be used. The power cord must be accessible
and contain a protective earth ground. Do not position the equipment so that it is
diculttoremovethepowercord.
Ventilation!Donotblockairowtoventilatingfanslocatedonrearofinstrument.
To see information about the conguration of your new CPC6050, touch the Next Page Button [ ]
then the Information Application (App) icon [ ] on the menu and a window will appear listing the
Mensor contact information, model number and the transducers that are installed. Press the Previous
Page Button [ ] then the Home App [ ] to return to the main screen.
Information Application
!
Caution