Device Description MV4-150-TA1, MV4-450-TA1, MV4-170-TA1, MV4-470-TA1 1-13
Moeller 07/01 AWB-C2700-1347GB
b) Installation of the units with a stainless steel front
Special care should be taken during mounting to ensure correct sealing to IP 65.
1. Slide the front seal from the rear over the unit cover onto the fixing bolts.
2. Place the device from the front into the housing cutout.
3. The front seal must be make flat and uniform contact between the front plate and front cover.
4. The nuts must be uniformly and securely tightened.
5. Ensure correct positioning and application of even pressure of the front seal.
Pay close attention to the mounting instructions (→ Section 4).