3-2 Chapter 3: Installation
Installation Steps
ThefollowingaretheeightinstallationstepsforinstallingtheRealScan74.
1. Verifyinstallationpreparation(scannerandcheckstand)
2. Cableinstallationpreparation
3. InstallSensormatic®orCheckpointantenna(optional)
4. ConnectCables
5. PutRealScan74incheckstandcutout
6. VerifyTopPlatealignment
7. Calibratethescale
8. Setup
Sensormatic®orCheckpointdeactivation(applicableonlyifSensormatic®
orCheckpointantennaisinstalled)
9. Verifyunitisoperational
Step 1: Verify Installation Preparation
Reporting a Damaged Unit
AfterreceivingtheNCRRealScan74,inspecttheshippingcartonfordamage.Ifthe
RealScan74isdamagedduetoshipping,notifythecarrier,theNCRrepresentative,or
thesupplieriftheunitisnotpurchaseddirectlyfromNCR.
Package Contents
AfterunpackingtheRealScan74,takeinventorytoensurethatallcomponentsare
received.
Thefollowinglistidentifiesthepackagecontents.
• NCRRealScan74
• PowerSupply(separatepackageifordered)
• PowerCord(separatepackageifordered)
• TopPlate
• InterfaceCable(separatepackageifordered)
• Power
CordDocuments(forInternationalUnits)
• Thelabelwhichidentifiesthemodelnumber(forexample,RealScan7874–4xxx)
• CustomerSatisfactionHotlineDetails
• NCRRealScanScanner/ScaleSafetyandRegulatoryInformation(B005‐0000‐1699)