EasyManuals Logo

NEC Express5800 Series User Manual

NEC Express5800 Series
358 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #239 background imageLoading...
Page #239 background image
Installing and Using Utilities 5-55
Procedure in NEC ESMPRO Manager
Perform the procedure below before replacement of a component.
1. Select the target component in the [ft] tree.
2. Check the current state with the "State" display on the target component screen.
3. Click the [Clear] button in the [MTBF Clear] of the target component.
The MTBF clearing result can be confirmed by the MTBF information on the target
component screen. The result of the MTBF clearing operation is reported by the server as an
alert.
CHECK:
At this point, the "State" display on the target component screen is not changed.
If the MTBF clear is executed in the following conditions, diagnostics of the CPU/IO
modules are automatically performed after MTBF clear:
- The target CPU/IO module is turned on
- Both of the target CPU module and IO module are stopped
4. Start the component.
CHECK:
At this point, the "State" display on the target component screen is changed.
Sample screen of NEC ESMPRO Manager
[Maintenance] screen of IO module
[PCI module] – [Maintenance]

Table of Contents

Other manuals for NEC Express5800 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NEC Express5800 Series and is the answer not in the manual?

NEC Express5800 Series Specifications

General IconGeneral
SeriesExpress5800
CategoryServer
ProcessorIntel Xeon processors
NetworkGigabit Ethernet, 10 Gigabit Ethernet (Varies by model)
Operating System SupportWindows Server, Linux variants
Form FactorTower, Rackmount (1U, 2U, etc. - varies by model)
MemoryDDR4 ECC DIMM (Capacity varies by model)
StorageSAS/SATA HDD/SSD, NVMe SSD (Configuration varies by model)

Related product manuals