RADWIN2000D+UserManual Release3.6.00 4‐12
HardwareInstallationWorkflowforaRADWIN2000D+link Chapter4
4.5HardwareInstallationWorkflowfora
RADWIN2000D+link
4.5.1InstallingaLink
SiteSurvey
TheSiteSurveyiscarriedoutasdescribedinSiteSurvey.RecallthattheSiteSurveyhasthree
mainsteps:
• Stage1:PreliminarySurvey
• Stage2:PhysicalSurvey
• Stage3:RFSurvey
Sitepreparation
SitePreparationincludes‐
• Obtaininganynecessarylegalandstatutorypermitsforinstallationofradioequipment
• Clearingphysicalobstructionsasfaraspossible
• Erectingamastortowerifrequired.Amast‐sitedODUtypicallyusesapoleattachedto
themast.
• Installingapoleonabuildingwallifrequired
• Constructingaweather ‐proofcabinettohouseaPoEdeviceorotherIDUifitisnotto
behousedindoors
• Ensuringavailabilityofpower,typicallystandardlocalACpowe r
• EnsuringthatthereisaLANcableinplacefromtheuser’sswitchtothePoE/IDUloca‐
tion