Resulting PL for both channels:
Symmetrisation of
both channels:
MTTFd =
MTTFd_A +MTTFd_B −
1
_A
1
_B
=21,5 Jahre
DC average value
DCavg=
DCSwitch
MTTFd_Türz
DCSinCos
MTTFd_SinCos
DCPES
MTTFd_PES
DCSchütz
MTTFd_Schütz
DCSTO
MTTFd_STO
1
MTTFd_Türz
+
1
MTTFd_SinCos
+
1
MTTFd_PES
+
1
MTTFd_Netzsch
PL
MTTFd = 21.5 years = medium
DC
avg
= 98 % = medium
PL =“d“ (from EN ISO 13849-1, Tables 5, 6 and 7)
In this case the B10d value for the door monitoring is definitive for the PL. If
a higher safety level is to be achieved, a correspondingly higher quality
switch is to be used.
Note:
It is also possible to determine the PL using the tool "Sistema" from the BGIA, among others.
12.3.8 Verification of software (program) and parameters
The verification/validation is undertaken in two steps:
• Check on the FUP in relation to the specified functionality
• Check on the FUP against the IL listing in the validation report, and the parameters
specified against those in the validation report.
12.3.8.1 FUP check
The FUP actually programmed is to be checked against the requirements in the specification.
Note:
The comparison is all the more efficient the clearer the programming has been structured in
relation to the safety functions.