102
8009389/YN39/V3-0/2015-08| SICKOPERATING INSTRUCTIONS|GM35
Subject to change without notice
MAINTENANCE
All other service activities are carried out at the measuring point:
▸ Check that all the system components of the measuring system are present.
▸ Check the ambient conditions:
– Do the ambient conditions regarding dust, temperature, and air humidity still match
the intended conditions, or have they changed (for example, as a result of structural
measures)?