PROJECT PLANNING INFORMATION
3 Project Planning Information
3.1 Work steps from system selection to start-up
Application changes
If the information regarding your application submitted with your purchase order has
changed, or if a device is to be used for an application other than the one that was
originally intended, please contact your local sales representative or our project planning
department to determine whether the device(s) can be used under the new conditions, and
whether readjustment or reparametrization is necessary.
The following steps are generally carried out before the measuring system is started up:
The version of the TCU-MS operating unit is selected according to the external signals to be
processed or output.
• Project planning
See planning checklist below
• Initial onsite installation
Following preparatory work normally carried out by the customer is described on
page 26:
• Flange assembly,
see page 27.
– Preparation for assembling the purge air unit, see page 29.
– Laying the signal and power supply cables to the measuring point, see Chapter 3.9 ,
page -33.
– Preparations for installing the EvU, see “Installation preparation for the evaluation unit”,
page 30
.
– Possibly preparation of signal cables for the interface to peripheral equipment, see
“Preparations for electrical installation”, page 30
• Device installation
To allow speedy start-up, the following components are normally installed ready for
operation before the start-up date;
see “Installation”, page 36.
– Purge air unit
– Evaluation unit
• Start-up
The actual start-up procedure is carried out by trained personnel or SICK Customer
Service. This work is described on
page 53. The main activities are adjustment tasks on
the GM35 system related to the application.