Parameterization
9.3 Parameters
3KC ATC6300 transfer control device
136 Manual, 03/2018, L1V30535632002A-01
9.3.9
P09 - Automatic test
P09
Automatic
test
Designation on ATC
display
Description
Unit
Default
Range
P09.01 Auto test enable Enabling the automatic test
Enables the execution of the periodic test.
This parameter can be modified directly from
the front operator panel, without invoking the
setup procedure. Its current status is displayed
on the corresponding display page, see chapter
Automatic test (Page 51).
OFF OFF / ON
P09.02 Auto test period Interval between performing the TESTS
Interval between two periodic tests. If the test
is not enabled on the day it becomes due, the
period is extended to the next enabled day.
7 1gg-60gg
P09.03 Auto Test Monday TEST execution on Monday
- Enables the performance of the automatic test
on the individual days of the week.
OFF means that the test is not performed on
that day of the week.
ON OFF / ON
P09.04 Auto Test Tuesday TEST execution on Tuesday
- see Parameter 09.03
ON OFF / ON
P09.05 Auto Test Wednes-
day
TEST execution on Wednesday
- see Parameter 09.03
ON OFF / ON
P09.06 Auto Test Thursday TEST execution on Thursday
- see Parameter 09.03
ON OFF / ON
P09.07 Auto Test Friday TEST execution on Friday
- see Parameter 09.03
ON OFF / ON
P09.08 Auto Test Saturday TEST execution on Saturday
- see Parameter 09.03
ON OFF / ON
P09.09 Auto Test Sunday TEST execution on Sunday
- see Parameter 09.03
ON OFF / ON
P09.10 Auto test hour Hour of TEST start
- Specifies the hours and the minutes for the
start of the periodic test.
h 12 00-23
P09.11 Auto test minute Minutes of TEST start
- see Parameter 09.11
min 00 00-59