21
SJ12 E, SJ16 E, SJ20 E
241914ACA
Visual and daily maintenance inspections Section 2 – Scheduled Maintenance
1.7-9 Lift mechanism
1
Mast assembly, B
▪
Make sure the mast assembly shows no signs
of visible damage, deformation, or cracks in
the weldments.
1. Raise the platform.
2
Wear pads, B
▪
Make sure the bolts are tight.
▪
Make sure there are no loose or missing parts.
▪
Make sure there is no visible damage.
2. With platform raised, inspect the base of the
mast to make sure there is no damage, cracks
or missing parts.
1.7-10 Optional equipment
3
Dual ashing lights, B
▪
Make sure there are no loose or missing parts.
▪
Make sure there is no visible damage.
4
Wind rating control console, B
▪
Make sure all switches are in the neutral
position, and are correctly attached.
▪
Make sure there are no loose or missing parts.
▪
Make sure there is no visible damage.
5
ECOTray, B
▪
Make sure there is no visible damage.
▪
Make sure there are no loose or missing parts.
▪
Make sure the absorbent pads are dry. If the
absorbent pads contain hydraulic uid, lock and
tag the MEWP and remove it for servicing.
3
1
2
4
5