21
SJ12 E, SJ16 E, SJ20 E
241914ACA
Visual and daily maintenance inspections Section 2 – Scheduled Maintenance
1.7-9 Lift mechanism
1
Mast assembly, B
Make sure the mast assembly shows no signs
of visible damage, deformation, or cracks in
the weldments.
1. Raise the platform.
2
Wear pads, B
Make sure the bolts are tight.
Make sure there are no loose or missing parts.
Make sure there is no visible damage.
2. With platform raised, inspect the base of the
mast to make sure there is no damage, cracks
or missing parts.
1.7-10 Optional equipment
3
Dual ashing lights, B
Make sure there are no loose or missing parts.
Make sure there is no visible damage.
4
Wind rating control console, B
Make sure all switches are in the neutral
position, and are correctly attached.
Make sure there are no loose or missing parts.
Make sure there is no visible damage.
5
ECOTray, B
Make sure there is no visible damage.
Make sure there are no loose or missing parts.
Make sure the absorbent pads are dry. If the
absorbent pads contain hydraulic uid, lock and
tag the MEWP and remove it for servicing.
3
1
2
4
5