Section 5 – Procedures Platform
16. Tilt the lower platform backwards.
17. Use an appropriate lifting device or a second
person to help remove the lower platform.
18. Remove and set aside the link weldment, washer
and spacer from the load cells.
5.2-2 Install the Platform
1. Install the link weldment, washer and spacer onto
the load cells.
2. Use an appropriate lifting device or a second
person to help install the lower platform.
3. Tilt the platform towards the chassis.