82
SJ12 E, SJ16 E, SJ20 E
241914ACA
Section 5 – Procedures Platform
6. Use the bolts and washers removed earlier to
secure the lift cylinder to the masts. Start with the
innermost mast and progress to the outermost
mast.
7. Put the mast cover on top of the mast.
8. Fasten it in place with the hardware removed
earlier.
5.3-4 Remove the Mast and Lift Cylinder
Together
1. Remove the platform and set it aside on a
protective surface. Refer to section 5.2-1 Remove
the Platform.
2. Use a sling to secure the junction box to the
manual box bracket. Make sure the junction box
does not hang from the load cell wires when the
mast assembly is removed later.
3. Open the service compartment access door.
4. Disconnect the mast cable from the main harness.
5. Cut zip ties along the cable bundles to free the
mast cable.