EasyManua.ls Logo

Steris V-PRO maX 2 - Before Operating Unit

Steris V-PRO maX 2
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Operation
33
10085896_H
V-PRO
®
maX 2
Operator Manual
NOTE: Before operating this Sterilization System, all installation requirements must be met. Please
refer to Installation Verification.
6.4 Before Operating Sterilization Unit
The following steps must be performed daily prior to Low Temperature Sterilization System usage:
1. Ensure chamber interior is clean. Refer to General Section if cleaning is necessary.
2. Ensure Sterilant Cup is installed. Refer to Sterilant Cup Installation and Removal Section.
3. Verify printer is supplied with sufficient amount of paper. A colored warning stripe is visible when paper roll is
near the end. Refer to Change Printer Paper Roll Section if paper roll needs replaced.
4. Load Sterilization Unit. Refer to Load Sterilization Unit Section.
5. Close Unit door.
6. If power is OFF, turn Sterilization System power switch to ON. Control displays IN STANDBY screen followed by
SELECT CYCLE (or Ready) screen as shown in Figure 6-1.
7. Unit needs approximately 45 minutes to reach operating temperature after SELECT CYCLE (or Ready) screen
displays.
8. Verify Unit has completed Start-Up successfully.

Table of Contents

Related product manuals