139MS 441, MS 441 C
– Install throttle cable retainer and
throttle cable, b 7.3.2.
Reconnect front handle heating
element and wiring harness,
b 11.5.
: Pull wiring harness (1) through
the opening (arrow).
– Install carburetor housing,
b 14.6.2.
219RA601 TG
1
1
: Push grommet (1) over wiring
harness until it rests against the
shrink hosing, then press it into
the opening (arrow).
: Push round connector (1) into
heating switch.
219RA603 TG
1
: Fit cable retainer (1).
: Press wiring into cable guides
(arrows).
219RA604 TG
1
: Route wiring harness (1) through
the opening (arrow) and
grommet (2).
2
219RA608 TG
1
: Push connector and socket
terminal (arrow) together as far
as possible.
– Slide insulating tube (1) over the
plug connection.
219RA605 TG
1
– Press wiring and plug connection
into the cable guides (arrows).
The generator lead must be
accurately seated in the cable
guides.
219RA607 TG
: Guide wiring harness (1) through
under the plug connection
(arrow).
219RA600 TG
1