1D-50 Engine Mechanical:
• Install the gearshift cam (3) and its related parts.
– Gearshift cam stopper (4)
– Snap ring (5)
–Spring (6)
– Snap ring (7)
CAUTION
!
Always use new snap rings ((5) and (7)).
Special tool
(A): 09900–06106 (Snap ring pliers)
• Position the gearshift cam in the neutral position as
shown. This will allow the gearshift forks and
transmission gears to be installed easily.
• Install the gearshift forks into the crankcase in the
correct position and direction.
– For the 6th (Top) driven gear (8)
– For the 3rd/4th drive gear (9)
– For the 5th driven gear (10)
• Hold the gearshift forks (11) by hand when installing
the gearshift fork shaft (12).
• Install the bearing pins (13) and C-rings (14) into the
upper crankcase.
3
4
5
6
I649G1140145-01
7
(A)
I649G1140146-02
I649G1140147-01
10
9
8
I649G1140148-02
11
12
I649G1140149-01
13
14
14
13
I649G1140150-02