5-4 CVT
CVT ASSEMBLY INSTALLATION
• Remove the valve timing inspection cap
1.
• Install the special tool to the engine assembly as shown.
• Apply SUZUKI MOLY PASTE to the primary driven gear shaft
and clutch shaft.
[ 09920-31050: CVT guide
Y99000-25140: SUZUKI MOLY PASTE
• Engage the spline and install the CVT assembly by turning
the crankshaft slowly.
• Install the bracket
2.
• Tighten the CVT mounting bolt to the specified torque.
! CVT mounting bolt: 50 N·m (5.0 kgf-m, 36.0 lb-ft)
• Install the valve timing inspection cap
3.
ENGINE INSTALLATION 3-10