FUEL SYSTEM AND THROTTLE BODY 7-15
THROTTLE BODY REMOVAL
• Remove the front box. (9-18)
• Disconnect the PCV hose from the bottom side of the air
cleaner box.
• Remove the air cleaner box
1.
• Remove the IAP sensor
2.
• Disconnect the IAT sensor coupler
3.
• Remove the PAIR solenoid valve
4.
• Loosen the respective throttle body clamp screws (air cham-
ber side).