EasyManua.ls Logo

Suzuki AN650 2002 - Chassis Bolt and Nut

Suzuki AN650 2002
463 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-28 PERIODIC MAINTENANCE
CHASSIS BOLT AND NUT
Check that all chassis bolts and nuts are tightened to their specified torque. (Refer to page 2-28 for the loca-
tions of the following nuts and bolts on the motorcycle.)
Tighten initially at 1 000 km (600 miles, 1 month) and
every 6 000 km (4 000 miles, 6 months) thereafter.
ITEM N·m kgf-m lb-ft
1 Steering stem head nut 65 6.5 47.0
2 Front fork upper clamp bolt 23 2.3 16.5
3 Front fork lower clamp bolt 23 2.3 16.5
4 Front axle 65 6.5 47.0
5 Front axle pinch bolt 23 2.3 16.5
6 Handlebar clamp bolt 23 2.3 16.5
7 Front brake master cylinder mounting bolt 10 1.0 7.0
8 Front brake caliper mounting bolt 26 2.6 19.0
9 Brake hose union bolt 23 2.3 16.5
0 Air bleeder valve 7.5 0.75 5.5
A Brake disc bolt (Front & Rear) 23 2.3 16.5
B Rear brake caliper mounting bolt 26 2.6 19.0
C Rear brake master cylinder mounting bolt 10 1.0 7.0
D Front footrest bracket mounting bolt (M8) 26 2.6 19.0
(M6) 11 1.1 8.0
E Swingarm pivot nut 100 10.0 72.5
F Rear shock absorber mounting nut
(Upper & Lower)
29 2.9 21.0
G Rear axle nut 100 10.0 72.5

Table of Contents

Related product manuals