EasyManua.ls Logo

Suzuki LT-F500F 2002 - Page 148

Suzuki LT-F500F 2002
382 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-106 ENGINE
Tighten valve timing inspection plug
4 to the specified
torque.
# Valve timing inspection plug:
23 N·m (2.3 kgf-m, 16.5 lb-ft)
RECOIL STARTER
Temporarily install the recoil starter.
GEARSHIFT LEVER
Install the shift lever position switch
1 and snap ring
2.
Install the shift lever assembly
3 with the pin engaged with
the switch
1.
Install the snap ring
4.
Install the recoil starter.
Apply a small quantity of THREAD LOCK 1342 to the bolts.
& 99000-32050: THREAD LOCK 1342
Install the gearshift lever
5.

Table of Contents

Related product manuals