EasyManua.ls Logo

Technoton DUT-E AF - DUT-E Installation; Exterior Inspection Prior to Starting Works

Technoton DUT-E AF
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DUT-E installation / Exterior inspection prior to works start
DUT-E fuel level sensors. Operation manual. Version 8.1
© Technoton, 2020 24
2 DUT-E installation
For DUT-E correct operation its mounting and configuration should be carried out by certified
specialists who have passed corporate technical training.
ATTENTION: Strictly follow safety rules of automobile repair works as well as local
safety rules of the customer company when mounting sensor.
DUT-E can be mounted either into the flange of factory mounted float sensor* or into a
specially drilled hole of the fuel tank.
This chapter contains basic recommendations on DUT-E installation. Detailed instructions
regarding the sensor installation are provided in the DUT-E Installation guide.
In the DUT-E fuel level sensor installation video you can see the general order of
sensor installation
2.1 Exterior inspection prior to starting works
It is necessary to conduct DUT-E exterior inspection for the presence of the possible defects
arisen during transportation, storage or careless use.
Contact the product supplier if there any defects.
* Study carefully the layout of the mounting bores for a factory mounted fuel sensor and
compare it with the drawing of bores for a DUT-E mounting plate.

Table of Contents