EasyManua.ls Logo

TGW Natrix - Replace Sorter Link Chain [7]

Default Icon
111 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Natrix IOM
Replace sorter link chain [7]
Remove tension from sorter link chain and screws [1].
Remove protective cover [2] on both sides.
Run the sorter in maintenance mode until two master links are visible on the chain strand
[6] at a distance of 1371.6 mm (4’ 6”) in the working area.
Loosen screws [3] and remove profile aluminum slat [4] above connecting link [6].
Remove master chain links and profile sorter slats.
Install new sorter profile slats and chain again in reverse order.
Attention: Tension Drive Chain.
The closed side of the master link locking spring [5] must point in the conveying
direction.
Sorter profiles must be aligned in a 90° angle to the framework (see Drive Chain
Adjustments).
Screws [3] Important tightening torques M
A =
20 Nm (14.75Ft / Lbs.)
Revision Date: 12/10/2014 Page 47 of 111

Table of Contents