2-2 Installing the Detector
Preparing for installation
Major steps in installing the detector
After installing the detector, you should verify its functions and keep the
verified chart output (if applicable) on file. Verification ensures proper
operation of the detector optics and electronics. For proper verification
procedures, see “Verifying the detector” on page 3-27.
Start installation
procedure
Installation
complete
Select appropriate
site
Unpack and
inspect
Make power
connections
Make signal
connections
Install detector
Make connections
to other devices
Make fluid line
connections