ACS2000 User manual 2UEA001270 Rev. F TOC-3 (6)
Chapter 4 - Transportation, storage and disposal 4-1
4.1 Transportation 4-1
4.1.1 Unpacking and inspection 4-1
4.1.2 Lifting and transportation 4-2
4.2 Storage 4-5
4.2.1 Storage conditions 4-5
4.2.2 Storage 4-5
4.3 Storage and handling instructions for spare parts 4-8
4.4 Disposal of packaging materials and components 4-8
Chapter 5 - Mechanical installation 5-1
5.1 Safety 5-1
5.2 Overview of installation procedure 5-1
5.3 Installation site requirements 5-1
5.3.1 Ambient operation conditions 5-1
5.3.2 Foundation requirements 5-2
5.3.3 Recommendations for cable ducts and fire protection 5-2
5.4 Drive installation 5-2
5.4.1 General notes on installation 5-2
5.4.2 Dimensions and clearances 5-3
5.4.3 Base mounting 5-3
5.4.4 Fan outlet box installation - Frame 1 (if required) 5-4
5.4.4 Fan outlet box and external fan installation - Frames 2, 3 (if required) 5-5
5.4.5 Redundant fan installation - Frame 1 (option) 5-7
5.4.5 Redundant fan installation and removal procedures - Frames 2, 3 (option) 5-10
Chapter 6 - Electrical installation 6-1
6.1 Safety 6-1
6.1.1 Isolating means (MV Switchgear) 6-1
6.2 Overview of installation work 6-2
6.3 Cables and wires 6-3
6.3.1 Medium voltage power cables 6-3
6.3.2 Ground cable 6-4
6.3.3 Bonding conductor 6-4
6.3.4 Auxiliary power cables 6-4
6.3.5 Control cables 6-4
6.4 Cable entry 6-5
6.4.1 TEU (Terminal Entry Unit) for power cables and ground cable 6-5
6.4.2 Cable entry for ground cable, line supply and motor cables 6-6
6.4.3 Cable entry for auxiliary power and control cables 6-6
6.5 Ground cable and cable shield connections 6-7
6.5.1 Recommended grounding and bonding of the drive system 6-8