TOC-4 (6) 2UEA001270 Rev. F ACS2000 User manual
6.6 Line supply and motor cables 6-9
6.6.1 Further information 6-9
6.6.2 Cable preparation 6-9
6.6.3 Cable connection 6-11
6.7 Auxiliary power, control and fieldbus communication cables 6-14
6.7.1 Further information 6-14
6.7.2 Cable preparation 6-15
6.7.3 Cable connection 6-16
Chapter 7 - Commissioning 7-1
7.1 Required qualification 7-1
7.2 Procedure 7-1
7.3 Checklist 7-1
7.4 Customer assistance 7-1
7.5 Customer acceptance 7-1
Commissioning checklist 7-3
Mechanical installation 7-3
Electrical installation 7-3
MV switchgear 7-4
Motor 7-4
Insulation tests 7-4
Power supply 7-5
Miscellaneous 7-5
Chapter 8 - Local operation 8-1
8.1 Overview 8-1
8.2 Safety 8-1
8.3 Local operation 8-1
8.3.1 Overview of local operator panel 8-1
8.3.2 Lamp-test function 8-3
8.4 Status messages 8-3
8.4.1 Overview of status messages 8-3
8.4.2 Start sequence of the drive 8-5
8.4.3 Stop sequence 8-6
8.4.4 Emergency-off sequence 8-7
8.5 Starting the drive system 8-8
8.5.1 Checks before starting the drive system 8-8
8.5.2 Starting the drive system from remote 8-8
8.5.3 Starting the drive system locally 8-9
8.6 Stopping 8-11