EasyManua.ls Logo

ABB CRB 15000 - Page 579

ABB CRB 15000
1096 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Press the tilt out of position using two of the pre-
vious attachment screws as removal tools.
3
xx2000002131
Remove the tilt from the tubular.
Assist the cabling to be removed while lifting away
the complete tilt.
Place the tilt on a workbench.
4
Replacing the tubular
NoteAction
Tubular: 3HAC074509-001 (for
CRB 15000-5/0.95)
Replace the tubular.1
Tubular: 3HAC083685-001 (for
CRB 15000-10/1.52)
Tubular: 3HAC081054-001 (for
CRB 15000-12/1.27)
Refitting the tubular
Use these procedures to refit the tubular.
Preparations before fitting the joint unit
NoteAction
ELECTROSTATIC DISCHARGE (ESD)
The unit is sensitive to ESD. Before handling the
unit read the safety information in section The
unit is sensitive to ESD on page 53.
1
Continues on next page
Product manual - CRB 15000 579
3HAC077389-001 Revision: L
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.4.3 Replacing the tubular
Continued

Table of Contents

Related product manuals