5.6.3 Replacing the axis-2 joint unit (CRB 15000-5/0.95)
Location of the axis-2 joint unit
The joint unit is located as shown in the figure.
xx2000001948
Summary of the replacement procedure
This is a brief summary of the replacement procedure, containing the major actions
to be performed.
1 Separate the cabling between the swing and the lower arm.
2 Remove the lower and upper arm undivided.
3 Remove the swing cover.
4 Replace the joint unit. Move the cabling from old to new joint unit.
Continues on next page
848 Product manual - CRB 15000
3HAC077389-001 Revision: L