EasyManua.ls Logo

ABB CRB 15000 - Replacing the Tubular

ABB CRB 15000
1096 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.4.3 Replacing the tubular
Location of the tubular
The tubular is located as shown in the figure.
xx2100000052
Summary of the replacement procedure
This is a brief summary of the replacement procedure, containing the major actions
to be performed.
1 Separate the cabling between the housing and the tubular (at the axis-3 joint
unit).
2 Remove the complete tubular.
3 Remove the axis-4 joint unit.
Continues on next page
562 Product manual - CRB 15000
3HAC077389-001 Revision: L
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.4.3 Replacing the tubular

Table of Contents

Related product manuals