EasyManua.ls Logo

ABB IRB 5720 - Page 517

ABB IRB 5720
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Person 1, working at the side hole:
xx2000000416
Remove the cable harness out from the
wrist.
Tip
This step is best performed by two persons
working together:
Person 1: Put one hand inside the
side hole and take a hold of the
cable harness.
Person 2: Take a hold on the cable
harness inside the wrist.
Together: Move the cable harness
past the axis-5 motor and into the
arm tube.
6
Person 2, working at the wrist:
xx1300000746
Person 1, working at side hole:
xx2000000416
Remove the cable harness out of the arm
tube, at the back of the upper arm.
Tip
This step is best performed by two persons
working together:
Person 1: Put one hand inside the
side hole and take a hold of the
cable harness.
Person 2: Take a hold on the cable
harness at the back of the robot.
Together: Move the cable harness
out of the arm tube.
7
Person 2, working at the back:
xx1700001568
Continues on next page
Product manual - IRB 5720 517
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.9.3 Replacing the axis-3 gearbox
Continued

Table of Contents

Related product manuals