EasyManua.ls Logo

ABB IRB 5720 - Page 63

ABB IRB 5720
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Guide sleeve holes (2 pcs)A
Base plate
This section details how to secure the base plate to the foundation.
NoteAction
Make sure the foundation is levelled.1
CAUTION
All lifting equipment used must be sized ac-
cordingly!
2
Shown in figure Base plate, orienting
grooves and leveling bolts on page 61.
Position base plate in relation to the robot
work location using the grooves in the base
plate.
3
Lift the base plate to its mounting position.4
Attachment holes: 16 pcs.Use the base plate as a template and drill at-
tachment holes as required by the selected
bolt dimension.
5
Shown in figure Base plate, orienting
grooves and leveling bolts on page 61.
Fit the base plate and use the levelling bolts
to level the base plate.
6
If required, fit strips of sheet metal underneath
the base plate to fill any gaps.
7
Secure the base plate to the foundation with
screws and sleeves.
8
Maximum allowed deviation all over the
base plate, from one contact surface to
the other: 0.3 mm.
Recheck the four contact surfaces on the
base plate to make sure the base plate is
levelled and flat.
9
If it is not, use pieces of sheet metal or similar
to bring the base plate to a levelled position.
Product manual - IRB 5720 63
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
3 Installation and commissioning
3.3.2 Installing a base plate
Continued

Table of Contents

Related product manuals