EasyManua.ls Logo

ABB OmniCore C30 - Page 196

ABB OmniCore C30
606 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Required documents
NoteArticle numberDocument
3HAC059896-009,
3HAC063898-009,
3HAC072448-009
Circuit diagram - OmniCore C30,
Circuit diagram - OmniCore C30
for IRB 14050, Circuit dia-
gram - OmniCore C30 for CRB
15000
3HAC066561-001Application manual - Conveyor
tracking
3HAC066562-001Application manual - DeviceNet
Master/Slave
Installing the conveyor tracking module
Note/IllustrationAction
DANGER
Before doing any work inside the cabinet,
disconnect the mains power. For more
information, see Electrical safety on
page 31.
1
Location of wrist strap button:
xx1800000683
ELECTROSTATIC DISCHARGE
(ESD)
The unit is sensitive to ESD. Before
handling the unit read the safety inform-
ation in section The unit is sensitive to
ESD on page 47.
2
Fit the conveyor tracking module by
snapping it onto the mounting rail (not
supplied from ABB).
3
Connect the 24V power supply to the
conveyor tracking module from the IP20
power outlet or other power supply.
4
For more detail, see Application manu-
al - Conveyor tracking chapter Connecting
the CTM to the robot controller.
The CTM must be connected to Ethernet.
There are three main installation methods
for the Ethernet communication.
5
See Application manual - Conveyor tracking.Connect wires to the input and output
connectors as required.
6
For more information about the option Conveyor Tracking, see Application
manual - Conveyor tracking.
196 Product manual - OmniCore C30
3HAC060860-001 Revision: P
© Copyright 2019-2022 ABB. All rights reserved.
3 Installation and commissioning
3.8.2 Installing the conveyor tracking module
Continued

Table of Contents

Related product manuals