EasyManua.ls Logo

ABB OmniCore C30 - Connecting Power Supply to and Grounding the Controller

ABB OmniCore C30
606 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.5.5 Connecting power supply to and grounding the controller
Note
How to manufacture a cable with connector is described in section Fitting the
connector on page 92.
DANGER
A residual current device (RCD) must be installed.
Location of power supply connection
A
xx1700001060
Power inlet connector, X0A
Note
According to IEC60204-1, the power-operated switch should be installed between
600 mm to 1,900 mm above the servicing level. The switch will be easily
accessible.
Location of grounding point
Note
The whole cabinet ground is connected to the X0.PE point.
Continues on next page
Product manual - OmniCore C30 97
3HAC060860-001 Revision: P
© Copyright 2019-2022 ABB. All rights reserved.
3 Installation and commissioning
3.5.5 Connecting power supply to and grounding the controller

Table of Contents

Related product manuals