4/5
B 400
Start-up
GB 03293 - Edition 03 - March 12
Starting up
Your leak detector is multivoltage (from 90 to 240 V ± 10 %):
connect it to the power plug.
During the first starting up after reception, you can adjust the unit,
the date, the hour and the language of the displays and the digital
voice.
These parameters can afterward be modified if necessary.
(
C 303).
After an unused storage period, there is additional time at the start-
up for outgassing.
The countdown before using the leak detector is displayed.
The operator can cancel this additional time by pressing
. But it is not recommended. It is not abnormal that after
an unused storage period, the calibration fails. In this case, wait
30 minutes and do it again.
In case of starting up in too low temperature, there is additional
time at the start-up for outgassing and some components reheating.
The countdown before using the leak detector is displayed.
The operator can cancel this additional time by pressing
. But it is not recommended.
If you have never used a leak detector, know that there is no risk
of starting your detector and discovering the menus even without
particular knowledge. But we advise to read chapters B and C.
If you have already used this type of product, do not hesitate to
discover the menus by yourself. Read the chapter C.
1
st
starting up
Starting up after an
unused/
storage period
Cold starting up
Getting started with the
leak detector
adixen Vacuum Products - ASM 310 Operating instructions