Chapter 5: Powering On the Switch
109
The switch does not have an On/Off switch.
5. Wait several minutes for the switch to initialize its operating system.
To monitor the console messages as the device initializes the
management software, go to “Monitoring the Initialization Process” on
page 110.
Verifying Switch
Operations
Here are items to check to verify that the switch is operating normally. If
there is a problem, refer to Chapter 6, “Troubleshooting” on page 119 for
suggestions on how to resolve it.
The Fault LED should be off.
One or both PWR 1 and PWR 2 LEDs should be solid green,
depending on the number of DC power supplies connected to the
unit.
The LEDs on SFP slots with transceivers connected to active
network devices should be solid or flashing green.
The Link LEDs on twisted pair ports connected to active network
devices should be solid or flashing green or amber. The Link LEDs
are identified in Figure 11 on page 45.
The PoE LEDs on the switch should be solid green on ports that
are connected to PoE or PoE+ devices. The PoE LEDs are
identified in Figure 11 on page 45.
After verifying the operations of the switch, go to “Starting a Local
Management Session” on page 113.