EasyManua.ls Logo

ALTUS Nexto NX3004 - 8 Glossary

ALTUS Nexto NX3004
388 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8. Glossary
375
8. Glossary
Active CPU
In a redundant system, the Active CPU performs the system control, reading the input points values,
executing the applicative program and driving the output values.
ActivePrg
POU from the program type, created automatically, which should be completed by the user. It runs only
on the Active PLC, and used to control the automated process.
Active IP
Strategy to facilitate the connection of Ethernet clients to Ethernet servers executed on a redundant PLC.
Active PLC
Half-cluster (PLCA or PLCB) which is momentarily in Active state.
Adjust Bridge
Address or configuration selecting switch composed by pins present in the circuit board and a small
removable connector, used for selecting.
Addressable Variables
The variable can be accessed directly in the memory using the desired address. E.g. QB0%, %MW100.
Applicative Project
Part of the project corresponding to the executable code.
Applicative Program
It’s the program loaded into a PLC, which determines the operation of a machine or process.
AT Variable
Reserved words in the programming software, used to indicate diagnostics.
Bus
Electric signals cluster logically grouped with the function to transmit information and control between
different elements of a sub-system.
Bit
Basic information unit which can assume state 0 or 1.
Backoff
Time the network node type CSMA/CD waits before re-transmit data after the occurrence of collisions in
the physical environment.
Baud rate
Rate at which information bits are transmitted via a serial interface or communications network
(measured in bits/second).
Bridge
Equipment for connecting two communication networks within the same protocol.
Broadcast
Dissemination of information simultaneously to all nodes connected to a communication network.
Byte
Information unit composed by 8 bits.
Category 5
One of the UTP cable categories:. Unshielded twisted-pair 100 ohm impedance and electrical
characteristics supporting up to 100 MHz transmission frequency defined by the TIA / EIA 568-A, can be
used in 10Base-T and 100Base networks TX, among others.
Cluster
Set formed by the controllers (half-clusters) PLCA and PLCB.
Commercial code
Product code, formed by the PO letters followed by four numbers.
Communication
Network
Group of devices (nodes) interconnected by communication channels.
Configuration Module
Also called a module C. It is a single module in a PLC program that contains various parameters required
to the controller functioning, such as the amount of variables and layout of the I/O modules in the bus.
CPU
Abbreviation for central processing unit. Controls the information flow, interprets and executes program
instructions and monitors the devices in the system.
CSMA/CD
Physical layer access protocol, based in data collision, used for Ethernet networks.
Cycle Time
It is the time that the CPU takes to run a particular application task.
Database
Data base.
Default
Pre-defined value for a variable, used in case there’s no definition.
Deterministic
Communication
Network
Communication network where the transmission and reception of information between different nodes is
guaranteed with a maximum known time.
Diagnostic
Procedure used to detect and isolate failures. It’s also the data group used for such determination, which
serves for problem analysis and correction.
Direct Representation
Variable
The variable can be accessed directly in memory, using a web address. For example:% QB0,% MW100.
DG
Used abbreviation to indicate diagnostics in the LEDs
Download
Program or configuration load in the PLC.
ESD
Electrostatic discharge.
EIA RS-485
Industrial pattern (physical layer) for data communication.
EN 50170
In PROFIBUS networks, it’s the standard which defines the fieldbus.
Frame
An information unit transmitted through the network.
Freeze
In PROFIBUS networks, it’s the network state when the input data are frozen.
Full Duplex
Indicates that the devices can perform communication by transmitting / receiving data in both directions
simultaneously, i.e. it can transmit and receive at the same time.
Gateway
Equipment for connecting two networks with different communication protocols.
Hardkey
Connector normally connected to the parallel interface of a PC in order to avoid the execution of software
illegal copies.
Hardware
Physical equipment used in data processing where the programs (software) are executed.

Table of Contents