Contens
Cirrus 3/4/6000 DB2034 08.04
7
4.10 Wedge ring tyre roller.....................................................................................................................47
4.11 Packer coulter................................................................................................................................48
4.12 Extra coverage following harrow.....................................................................................................49
4.13 Track markers................................................................................................................................50
4.14 Operator terminal ..................................................................................................51
4.15 Distributor head and tramline system..............................................................................................52
4.16 Pre emergence marker (Option) .....................................................................................................53
4.17 Braking system...............................................................................................................................54
4.18 Electric hydraulic control block........................................................................................................54
5. Settings.........................................................................................................................................55
5.1 Selection of metering wheels..........................................................................................................55
5.1.1 Table – kind of seed – metering wheels..........................................................................................55
5.1.2 Exchanging metering wheels..........................................................................................................56
5.2 Setting the seed level sensor..........................................................................................................58
5.3 Setting the seed rate in the menu "Job"..........................................................................................59
5.3.1 Proportional seed rate change during operation..............................................................................60
5.4 Calibration test ...............................................................................................................................60
5.4.1 Calibration test on Cirrus with Vario gearbox with seed rate remote control.....................................60
5.4.2 Calibration of the Cirrus with full electric metering...........................................................................63
5.5 Fan speed......................................................................................................................................64
5.5.1 Fan speed table .............................................................................................................................64
5.5.2 Setting the fan speed on the oil flow control valve of the tractor ......................................................65
5.5.3 Setting the fan speed on the pressure relief valve of the machine...................................................65
5.5.4 Setting the fan speed in .........................................................................................66
5.5.4.1 Alarm trigger limit when the fan speed deviates from the required value..........................................66
5.6 Setting the seed placement depth...................................................................................................67
5.6.1 Advice for setting the seed placement depth...................................................................................69
5.7 Setting the length of the track markers............................................................................................70
5.7.1 Track marker length dimensions.....................................................................................................70
5.7.2 Setting the working intensity of the track markers............................................................................71
5.8 Disc harrow....................................................................................................................................72
5.8.1 Setting the working intensity...........................................................................................................72
5.8.2 Setting the length of the outer disc legs ..........................................................................................72
5.8.3 Setting the side discs......................................................................................................................73
5.9 Extra coverage following harrow.....................................................................................................74
5.9.1 Extra coverage following harrow – spring tine position ....................................................................74
5.9.2 Extra coverage following harrow pressure.......................................................................................75
5.9.2.1 Setting the normal harrow pressure ................................................................................................75
5.9.2.2 Setting the increased extra coverage following harrow pressure .....................................................75
5.10 Tramline system.............................................................................................................................76
5.10.1 Tramline rhythm .............................................................................................................................76
5.10.1.1 Example for creating tramlines .......................................................................................................78
5.10.1.2 Tramline rhythm 4, 6 and 8.............................................................................................................80
5.10.1.3 Tramline rhythm 2 and 6plus ..........................................................................................................81
5.10.2 Setting the tramline rhythm.............................................................................................................82
5.10.3 Setting the tramline counter............................................................................................................82
5.10.4 Seed rate reduction when creating tramlines ..................................................................................83
5.10.5 Switching on or off the intermittent tramline function .......................................................................83
5.11 Pre-emergence marker (option)......................................................................................................84
5.11.1 Marker disc carrier in the operational / transport position.................................................................84
5.11.2 Setting the track width and the working intensity of the pre emergence marker ...............................84
5.12 Setting the running time of the pre-charging system on the headlands............................................85
6. Initial operation.............................................................................................................................86
6.1 Required tractor .............................................................................................................................86
6.1.1 Required tractor capacity................................................................................................................86
6.1.1.1 Tractor engine capacity ..................................................................................................................86
6.1.1.2 Tractor pump capacity, hydraulic....................................................................................................86
6.1.1.3 Tractor connections, hydraulic (control valve) .................................................................................86
6.1.1.4 Required air pressure connections for dual circuit air brake system ................................................87
6.1.1.5 Tractor connections, electric...........................................................................................................87
6.1.1.6 Tractor hydraulic oils ......................................................................................................................87