Contens
8
Cirrus 3/4/6000 DB2034 08.04
6.1.1.7 Required tractor – weights and loads..............................................................................................88
6.1.1.8 Calculation data .............................................................................................................................88
6.1.1.9 Calculation of the minimum ballast front (
min
V
G )...........................................................................89
6.1.1.10 Calculation of the actual total weight (G
tat)
.......................................................................................89
6.1.1.11 Calculation of the actual front axle load (T
V tat
) of the tractor............................................................89
6.1.1.12 Calculation of the actual rear axle load T
H tat
)..................................................................................89
6.1.1.13 Calculation of the tyre load capacity ...............................................................................................90
6.1.1.14 Permissible and actual values (table)..............................................................................................90
6.2 Fitting advice for the connection of the hydraulic blower fan drive...................................................91
6.2.1 Circuit diagram for hydraulic blower fan drive..................................................................................91
6.3 Initial fitting of ........................................................................................................92
7. Putting to operation .....................................................................................................................93
7.1 Coupling and uncoupling the machine............................................................................................93
7.1.1 Coupling of the machine.................................................................................................................94
7.1.1.1 Creating hydraulic connections.......................................................................................................96
7.1.1.2 Connection of the hydraulic blower fan drive...................................................................................97
7.1.1.3 Creating electric supply connections...............................................................................................97
7.1.1.4 Connection of the brake system .....................................................................................................98
7.2 Uncoupling the machine.................................................................................................................99
7.2.1 Folding the machine wings down and in ....................................................................................... 102
7.2.1.1 Folding down the machine wings.................................................................................................. 102
7.2.1.2 Folding in machine wings .............................................................................................................104
7.3 Removal of the traffic safety board ............................................................................................... 106
7.4 Filling the seed hopper .................................................................................................................106
7.4.1 Input of filling quantity into the ............................................................................. 109
7.5 Lowering the pre emergence marker into working position............................................................ 110
7.6 Starting the operation................................................................................................................... 111
7.7 Locking the star wheel and actuating the STOP-key when the operation is stopped...................... 112
7.8 Locking the track marker actuation ...............................................................................................112
7.9 Folding in track markers at obstacles............................................................................................ 113
7.10 Visual inspection of the distributor heads...................................................................................... 113
7.11 Sowing in difficult soil conditions................................................................................................... 113
7.12 Turning at the headlands.............................................................................................................. 114
7.13 Emptying the metering unit or seed hopper and metering unit.......................................................115
7.14 Finishing operation in the field...................................................................................................... 117
8. Malfunction................................................................................................................................. 118
8.1 Indication of low seed hopper contents......................................................................................... 118
8.2 Fault in the metering system......................................................................................................... 118
8.3 Failure of during operation ..................................................................................119
8.4 Deviations between the adjusted and the actual seed rate............................................................120
9. Transport on public roads......................................................................................................... 121
10. Maintenance, repair and care work ...........................................................................................129
10.1 Check list for maintenance and care.............................................................................................129
10.1.1 Overview – lubricating points........................................................................................................ 132
10.1.1.1 Lubricants.................................................................................................................................... 132
10.2 Hydraulic system..........................................................................................................................133
10.2.1 Description of the hydraulic hose assemblies................................................................................134
10.2.2 Checking and maintenance intervals for the hydraulic hose assemblies (workshop job)............... 135
10.2.3 Flushing and calibrating the balancing system (professional workshop job)................................... 137
10.2.3.1 Emptying the balancer (professional workshop job) ......................................................................137
10.2.3.2 Filling and calibrating the balancing system (professional workshop job)....................................... 139
10.2.4 Pressure reservoir (professional workshop job).............................................................................143
10.3 Service brake system................................................................................................................... 144
10.4 Dual circuit air brake as part of the service brake system.............................................................. 145
10.4.1 Air pressure reservoir...................................................................................................................146
10.4.2 Inspection advice for the dual circuit air brake system (workshop job)........................................... 147
10.4.2.1 Leak test – quarterly (workshop job)............................................................................................. 147
10.4.2.2 Checking the pressure in the air pressure reservoir – quarterly (workshop job)............................. 147
10.4.2.3 Cleaning the hose filters- quarterly (workshop job)........................................................................147