PN 305892901, Rev S
Set Dryer Production Code button
Click to enter the Dryer Production Code for the dryer that is installed in
the analyzer. Click OK to accept.
You must enter a new dryer code each time you replace the dryer.
Set Moisture Generator Production Code
Click to enter the Moisture Generator Production Code.
Click OK to accept.
Figure 3-11.2.
Dryer Production Code entry
dialog box.
Figure 3-11.3.
Moisture Generator Production
Code entry dialog box.
Verication Duration
Enter the Verication duration in minutes. The system defaults to the mini-
mum time required.
Scheduled Verication
Schedule routine Verications by clicking the Daily, Weekly, or Monthly
button.
Never
No verify will be done. Scheduling slots at the bottom of the box are
not available.