EasyManua.ls Logo

BeneVision N17 - Page 64

Default Icon
146 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-36
The Visual Inspection of Device Enclosure and Accessories is passed.
The Contextual Inspection of Device Enclosure and Accessories is passed.
the Main unit label and Integrated warning labels are present and legible
The Protective Earth Resistance test is passed
The Earth Leakage Test is passed
The Patient Leakage Current test is passed
The Mains on Applied Part Leakage test is passed
The Patient Auxiliary Current test is passed
Recorder check
The recorder can print ECG waves correctly and the printout is clear.
Set the recorder to some problems such as out of paper, etc. the patient
monitor should give corresponding prompt messages. After the problem
is removed, the recorder should be able to work correctly.
Automatic alarm recording for each parameter functions correctly when
parameter alarms occur.
Network print test
The output of the printer's test page is normal.
Device integration check
Devices Integrated window can display the type of the external device,
ventilation mode, and corresponding parameters normally.
Battery check
The monitor can operates correctly from battery power when an AC
power failure accidentally occurs.
The operating time of the battery meets the product specification.
Mounting Check
The screws fastening the bracket and guide rail are not loose
The five installation screws on the bottom side of the N12/M12 monitor
are not loose.(six installation screws for N15/M15 and N17/M17)
The four installation screws on the transfer metal and monitor bottom
side are not loose
It can be installed in place and locked when N12 monitor use fast lock
installed way
The modules can be normally and securely inserted into the module rack
The trim strip is properly installed after the display is disassembled and
repaired
The VHM bracket can place the monitor at any height as required
Conclusion:
Qualified or not: (Yes No)
Signature of tester: Date:

Table of Contents

Related product manuals