EasyManua.ls Logo

Bruker HYPERION - Procedure

Bruker HYPERION
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
HYPERION User Manual Bruker Optik GmbH
Installation 2
2.6.3 Procedure
1 Make sure that the spectrometer is
switched off. To do this, check the setting
of the ON/OFF switch
.
Switch position in off-state: O
2
Connect the power cord
to the C5
connector of the external power supply
unit
.
3
Connect the low-voltage cable
to the
low-voltage socket
at the microscope
rear side.
4
Connect the power plug
of the power
cord to the mains socket outlet
.
Important note: Connect the power cord
only to a socket outlet with earthing con-
tact. Make sure that the socket complies
with IEC.

Table of Contents