EasyManua.ls Logo

CERUS INTERCEPT INT100 - Page 155

CERUS INTERCEPT INT100
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 6 – Maintenance, Transportation and Storage, Warranty and Service
Section 6.6 – Illuminator Calibration and Preventive Maintenance
6 - 13
Preventive Maintenance
Preventive maintenance (PM) is performed every 6 months after successful
INTERCEPT Illuminator installation, and is characterized as either major PM or
minor PM. The first scheduled PM is minor PM 6 months after installation. After
installation, major PM will be performed annually and minor PM will be performed
6 months after each major PM.
Major PM consists of tests and verifications of the illuminator systems and settings,
and implementation of any updates or corrections as required. In addition, all
UVA bulbs are replaced, key illuminator components are inspected for damage
and cleaned or replaced as necessary, and calibration and verification is
performed.
Minor PM consists of verification of system settings, and implementation of any
updates or corrections as required. The product illumination tray and glass plates
are inspected for damage and cleaned or replaced as necessary, and
calibration and verification is performed.
MAN-EN 00601, v3.0

Table of Contents